Skip to content
Sheen Builders

Loft conversions

Loft conversions in East Sheen & South West London

A loft conversion adds a bedroom, and often a bathroom, without giving up any garden, and much of the work happens from outside the living space below. The right type depends on the shape of your roof, how much headroom you have and what the planning rules allow on your street, which vary across East Sheen and South West London.

Types of loft conversions

  • Rear dormer

    A box-shaped extension to the rear roof slope that adds full-height floor space.

  • Hip-to-gable

    Straightening a sloping side roof into a vertical gable, common on semi-detached houses.

  • Mansard

    Rebuilding the rear roof slope at a steep angle for the most usable space; usually needs planning permission.

  • Roof-light (Velux) conversions

    Working within the existing roof with windows set into the slope, where headroom already allows.

What a loft conversion involves

Most loft conversions start with scaffolding and a temporary roof or protective sheeting, so the house stays dry while the roof is opened. New floor joists and any steel beams go in first, then the dormer or new roof structure is built and made weathertight. Inside, the new staircase is installed, the space is insulated, plasterboarded and wired, and any bathroom is plumbed in before decoration.

Because the heavy work is done from the scaffold, the floors below are often only disrupted when the new staircase is connected at the end. Most dormer and hip-to-gable conversions take roughly eight to twelve weeks on site; mansards and more complex roofs take longer. You receive a written programme before work starts.

Planning permission and permitted development

Many rear dormer and hip-to-gable conversions on houses can be built under permitted development, provided they stay within volume limits, don't face the road and use similar materials to the existing roof. Mansard conversions, front dormers, flats and houses in conservation areas or under Article 4 directions usually need planning permission. The current rules are on the Planning Portal, and a Lawful Development Certificate confirms that a permitted development scheme is lawful.

Building Regulations, fire safety and party walls

Every loft conversion needs Building Regulations approval. The key points are the strength of the new floor and roof, a safe staircase with enough headroom, insulation, and fire safety. Adding a storey changes the fire escape route, so the stairwell usually needs fire-resisting protection and interconnected smoke alarms.

On terraced and semi-detached houses, steels are often supported on the party wall, which means serving notice on your neighbours under the Party Wall etc. Act 1996 before work starts. The government's Party Wall guidance sets out the process.

How your project runs

  1. 1

    Survey

    We check the roof structure, headroom and the best position for the new staircase.

  2. 2

    Drawings and approvals

    Planning or a Lawful Development Certificate, building control and party wall notices, all in place before scaffolding goes up.

  3. 3

    Build

    The structure goes up and is made weathertight first, then insulation, services, the staircase and finishes.

  4. 4

    Handover

    Building control completion certificate, a snagging walk-round, and a finished room ready to use.

Frequently asked questions

Does a loft conversion need planning permission?

Many rear dormer and hip-to-gable conversions fall under permitted development, but mansards, front dormers, flats and homes in conservation areas usually need planning permission. Check the Planning Portal for the current rules.

Is my loft suitable for conversion?

It mostly comes down to headroom, the roof structure and where a staircase can go. A survey will tell you which type of conversion is realistic for your house.

How long does a loft conversion take?

Most dormer and hip-to-gable conversions take roughly eight to twelve weeks on site. Mansards and more complex roofs take longer, and your written programme will set out each stage.

Do I need to tell my neighbours?

If the new steels bear on a party wall, you will usually need to serve notice under the Party Wall etc. Act 1996 before work starts.

Guides

Planning a loft conversion?

Share a few details and we will arrange a visit to talk it through. There is no obligation.

Or call 07841 206689

So we can check it's in our area.

A few lines is plenty: what you'd like to build and anything we should know.

We use your details only to reply to this enquiry. Privacy policy

Call us Request a quote